PHUOC THANH CONSTRUCTION

Your Trust    ISO 9001 : 2015

Internal news

General News, Internal news, News

Year End Party of Phuoc Thanh Construction Joint Stock Company

Year End Party of Phuoc Thanh Construction Joint Stock Company

– On January 30, 2021, Phuoc Thanh Construction Joint Stock Company held the Year End Ceremony to summarize operations in 2020 at Riverside Palace Convention Center.

Công ty Cổ phần Xây dựng Phước Thành.

👉 As one of the most important events of the year of the Company, the party welcomed the attendance of representatives of Ptcons Board of Directors and member companies including:
  • • Phuoc Thanh Construction Joint Stock Company.
  • • Company Limited 276 Ngoc Long.
  • • Viet Phuc Construction Company Limited.
  • • Snow Seasons Saigon Company Limited.
  • • TLD Company Limited – HITECH.
  • • HITECH Investment and Service Joint Stock Company.
with customers and nearly 600 employees of the company
– At the party, the Board of Directors sent the guests and all employees and their family best wishes on the occasion of the new year.

Công ty Cổ phần Xây dựng Phước Thành.

———–
👏 👏 The party is a place for brothers and sisters to reunite, to share their joys and difficulties in the past time with tight fists, emotional hugs and confident smiles of people. Ptcons great family member. The special music performances from the brothers and sisters working in Phuoc Thanh continuously made the auditorium excited and received warm applause.

Công ty Cổ phần Xây dựng Phước Thành.

.👏All create a meaningful party and give the auditorium a full of emotions. Surely with the burning atmosphere of the party, the year 2021 promises to be a very successful new year. Some pictures:

Công ty Cổ phần Xây dựng Phước Thành.

Công ty Cổ phần Xây dựng Phước Thành.

Công ty Cổ phần Xây dựng Phước Thành.

Công ty Cổ phần Xây dựng Phước Thành.

Công ty Cổ phần Xây dựng Phước Thành.

Công ty Cổ phần Xây dựng Phước Thành.

Internal news, News

Periodic Health Checks in 2021 for All Employees of Ptcons

Periodic Health Checks in 2021 for All Employees of Ptcons

– On the morning of January 9, 2021, Phuoc Thanh Construction Corporation Company held a periodic health examination for all employees. The organization of health check is not only a method to check and assess the suitability of employees’ health but also a way to show proper care to officials and employees of the company.

👉The purpose of the periodical health examination:

  • Early diagnosis of diseases at an early onset, especially the common dangerous conditions such as diabetes, cardiovascular disease, stroke, cancer.
  • Monitor, detect and eliminate potential disease risk factors.
  • Improve the quality of life, ensure workers are full of health to work
  • Protecting employee health is also protecting the company’s human resources, creating sustainable development for businesses.
  • Improving productivity, reducing labor accidents as well as occupational diseases.
Some pictures of the health examination at the company this morning:
General News, Internal news

Groundbreaking ceremony of Phuc Dat Tower project

Ground breaking ceremony of Phuc Dat Tower project

Congratulations to the groundbreaking ceremony of Phuc Dat Tower project at 37 fronts of 1k highway, Dong Hoa, Di An New City, Binh Duong province, a great success between the investor of PHUC DAT Company and home main contractor PHUOC THANH Construction Joint Stock Company on the morning of December 24, 2020

General News, Internal news, News

The War With COVID – 19: Calm To Win

The War With COVID – 19: Calm To Win

Currently, the city has discovered 4 new cases of Covid infection – 19. To prevent the spread of the community, measures to prevent epidemics have been implemented, of which the most important is the urgent tracking of contacts Rapid test of close contact cases. Currently, bewildered psychology leading to inappropriate reactions has also appeared. In the fight with COVID-19, being calm for the right management is the key to success in disease control. It is necessary to distinguish and understand the following:

Tiếp xúc gần (F1) là gì?

Evidence currently shows that COVID-19 is transmitted by direct contact (close contact with an infected person through secretions from the mouth and nose), indirectly (through contaminated objects or surfaces). . This includes saliva, respiratory secretions or droplets. Drainage comes from an infected person’s mouth or nose when they cough, sneeze, speak or sing. Close contacts of an infected person can get COVID-19 when the infected droplets get into the person’s mouth, nose or eyes.

Therefore, the Ministry of Health has defined F1 close exposure as a person who has been in close contact within 2 meters of an identified case in the period from 3 days before the onset of the case until the case is isolated health. The onset of the case is counted as the day when the patient first perceived an abnormal symptom, possibly one of the following: fever, fatigue; body pain, cold thorns; decrease or loss of taste and smell; fever; a cough; sore throat … If the carrier is a carrier (who does not have any symptoms), the date of initiation is the date of sampling the specimen that tests positive for SARS-CoV-2.

Tiếp xúc của tiếp xúc gần (F2) là gì?

Be a person within 2 meters of close contact with F1 between the first day of exposure to the case (from 3 days before the onset of the case) until F1 is medically quarantined.

Nguy cơ dịch bệnh luôn hiện hữu, chúng ta cần làm gì?

– Preventing Covid – 19 in the new situation, it is important that we always have to be highly vigilant, avoid subjective psychology, but should not panic to have excessive and inappropriate reactions. The whole country is following the new normal state motto to achieve the dual goal. When an epidemic occurs, it is important to be calm, cooperative, and properly handled as recommended by the Health Sector, to avoid major disturbances to normal life

-People need to update information from official sources, avoid accessing too much inaccurate information that easily confuses us, causing public confusion. This is not good for an anti-epidemic activity that is inherently compared to the fight with COVID– 19. During a war, we all know that the winner is the one who calmly handles every situation. If we mess, we fail for ourselves, not because of COVID – 19.

THÔNG ĐIỆP 5K” TRONG THỜI ĐIỂM NÀY CỰC KỲ QUAN TRỌNG!!!

  • Masks: Wear fabric masks often in public places where people gather; wearing medical masks at medical establishments and isolated areas.
  • DEPRECIATION: Wash your hands often with soap or hand sanitizer. Cleaning surfaces / objects that are frequently in contact (doorknobs, phones, tablets, desks, chairs …). Keep the house clean, clean and well ventilated.
  • SPACE: Keep your distance from other people.
  • DO NOT Gather a lot of people.
  • MEDICAL DECLARATION: make a medical report on the NCOVI App; Install BlueZone application at https://www.bluezone.gov.vn to be warned about the risk of COVID-19 infection. When there are signs of fever, cough, difficulty breathing, call the hotline of the Ministry of Health 19009095 or the local health hotline for advice, support, and guidance to ensure safe medical examination.

Keep YOURSELF and COMMUNITY safe from the COVID-19 pandemic! Phuoc Thanh Construction Joint Stock Company wishes all employees, workers, and employees to actively join hands to help prevent, combat and repel disease.

Remember to always take preventive measures according to the 5K message: “Masks – Disinfectants – Distances – Not Concentrations – Medical Claims” to stay safe from disease.

“SỰ THÀNH CÔNG CỦA ĐỐI TÁC CHÍNH LÀ SỰ THÀNH CÔNG CỦA CHÚNG TÔI”

(Tin,ảnh: Phòng truyền thông Ptcons)

General News, Internal news, News

Groundbreaking Ceremony of Fideco Office Building Project_ District 1

Groundbreaking Ceremony of Fideco Office Building Project_ District 1

Congratulations to the groundbreaking ceremony of FIDECO office building project at 28 Phung Khac Khoan, Da Kao Ward, District 01, HCMC, a great success between the Investor of Foreign Trade & Investment Development JSC From Ho Chi Minh City and the main contractor PHUOC THANH JSC on the morning of November 30, 2020 👏

Khởi công Dự án tòa nhà văn phòng Fideco

The Groundbreaking Ceremony of Fideco Office Building Project of Foreign Trade Development & Investment Corporation of Ho Chi Minh City and Phuoc Thanh Construction Joint Stock Company

Khởi công Dự án tòa nhà văn phòng Fideco

On the side of HCM City Real Estate Association represented Mr. Le Hoang Chau – Association Chairman.

On the investor’s behalf, FIDECO Company:

  • Mr. Le Chi Hieu – Chairman of the Board of Directors of Thuduc House, Chairman of the Board of Directors of Fideco
  • Mr. Nguyen Vu Bao Hoang – General Director of Thuduc House, Vice Chairman of the Board of Directors of Fideco
  • Mr. Quan Minh Tuan General Director of Fideco
  • Mr. Le Du Dang Khoa – Deputy General Director of Fideco

On the side of the construction unit, Phuoc Thanh Construction Company:

  • Ms. Pham Thi Thanh Hang – General Director of Phuoc Thanh Construction Joint Stock Company
  • Ms. Vo Thi Lai_ Deputy General Director of Phuoc Thanh Construction Joint Stock Company
  • Mr. Tran Hai Lang – GDDA

Khởi công Dự án tòa nhà văn phòng Fideco

FIDECO Office Building is designed with 7 floors and 2 basements on a 1,238m² campus, with a total construction floor area of 6,394.9m², construction density of about 60%. The main function is office and commercial rental services. The building is designed according to the model of a professional, classy office by Italian architects and partners, with high ceilings, wide floor surface, fully equipped facilities suitable for technology 4.0, creating a Scientific and comfortable working environment, which enhances the creativity of users as well as increases the ability to interact with colleagues around.

Khởi công Dự án tòa nhà văn phòng Fideco

– PTCONS is honored to be highly appreciated by the investor for the construction quality, and selected as the main contractor for Fideco Office Building Project at 28 Phung Khac Khoan, District 01, HCMC. We are committed to construction on schedule, on safety, and to ensure absolute quality for the building

Khởi công Dự án tòa nhà văn phòng Fideco

The project is located in the heart of District 1, convenient traffic, easy to move quickly as well as save time traveling to other districts in the city, is really the ideal place for businesses looking for a professional and classy working space in the existing urban area in District 1, HCMC.

INFORMATION ABOUT PROJECT:

  • – Investor: HCMC Foreign Trade and Investment Development Joint Stock Company
  • – Main contractor: Phuoc Thanh Construction Joint Stock Company
  • – Project Management Consultant and Supervision Consultant: Saigon Construction Inspection Joint Stock Company (SCQC)
  • – Design consultant: TWOQ Architecture Joint Stock Company
  • – Total land area: 1,238m² – Land for construction of works: 724,8m² – Construction density: 59.99%
  • – Land for traffic: 242.69m² (19.6%)
  • – Land for green trees: 252.51m² (20.4%)
  • Number of floors: 7 floors and 2 basements
  • – Deadline for completion: Expected month 1.2022

“SỰ THÀNH CÔNG CỦA ĐỐI TÁC CHÍNH LÀ SỰ THÀNH CÔNG CỦA CHÚNG TÔI”

(Tin, ảnh: Phòng truyền thông Ptcons)

General News, Internal news, News

The Topping Out Ceremony Of Project Ricca_ District 9

The Topping Out Ceremony Of Project Ricca_ District 9

Congratulations to the successful topping off ceremony of the RICCA apartment project on the morning of November 30, 2020. On November 30, 2020, the Ricca project, Phu Huu ward, district 9, took off the roof on schedule after only one year of construction.

Lễ Cất Nóc Dự Án Ricca

On the morning of November 30, 2020, Tan Phu Construction Trading Service Co., Ltd – investor Ricca held a topping out ceremony of the project in Phu Huu ward, district 9, Ho Chi Minh City. Attending the ceremony were representatives of the investor, the representative of Phuoc Thanh Construction General Contractor, the developer and distributor of Rio Land, and partners participating in the project.

The Ricca apartment complex has the scale of two 18-storey towers, including 549 apartments from 1 to 3 bedrooms and 23 commercial and service apartments on a total area of 12,657.3 m2.

Over the past 5 years of establishment and development, with a lot of experience, PTCONS has always accompanied prestigious investors and continuously implemented the successful construction of residential areas on the HCMC market. Typically, in addition to the Ricca apartment district 9, there are also the riverside apartments d’Lusso and the luxury apartment Precia in district 2, with projects that have been handed over and put into operation such as Centana Thu Thiem, Thu Thiem. Dragon … These are all projects that have been positively received by the market when they bring a strong supply of quality products, a strong legal source, and ensure construction on schedule.

Summary of Ricca apartment in District 9:

Project name: Ricca

Investor: Tan Phu Service Trade Construction Company Limited

Developer: Rio Land Real Estate Joint Stock Company

General contractor: Phuoc Thanh

Scale of project: 1.2 ha – 02 blocks with 18 floors – 549 apartments

Commencement time: December 2019.

Time of handover: expected in quarter VI / 2021.

“SỰ THÀNH CÔNG CỦA ĐỐI TÁC CHÍNH LÀ SỰ THÀNH CÔNG CỦA CHÚNG TÔI”

(Tin, ảnh: Phòng truyền thông Ptcons)

General News, Internal news, News

Topping Out Ceremony of Minh Thong_ Distric 2

Topping Out Ceremony of Minh Thong_ Distric 2

Congratulations on the topping out ceremony of Tower A of D’lusso luxury apartment project on November 28, 2020 with a great success

LỄ CẤT NÓC DỰ ÁN MINH THÔNG 1

– Up to this point, we are very confident about the construction progress as committed by the D’LUSSO project. When the project is completed and handed over the following year, we not only hand over the apartment with a quality that exceeds expectations, but also bring a well-built internal landscape and amenities system. the most perfect “, the representative of Phuoc Thanh Company affirmed.

LỄ CẤT NÓC DỰ ÁN MINH THÔNG 1

D’LUSSO riverside luxury apartment complex is built on an area of 1.15ha, including 2 blocks of apartments A and B with 22-storey planning, 1 basement parking connected. The project owns an expensive riverside location and is located on Nguyen Thi Dinh Street, adjacent to Mai Chi Tho Avenue – An Phu intersection. Thanks to that, D’LUSSO residents not only own a river view, but also easily immerse themselves in the vibrant life in the urban center of District 2.

LỄ CẤT NÓC DỰ ÁN MINH THÔNG 1

In addition, D’LUSSO is also cared for by the investor with a perfect system of utilities, standard resort style in the heart of the city, including: 1,400m² riverside park, water square, chain of lakes continuous swimming in the air, unique sunken poolbar, commercial area, BBQ area … In addition, all apartments are also handed over to complete the interior of high-class European standards.

“SỰ THÀNH CÔNG CỦA ĐỐI TÁC CHÍNH LÀ SỰ THÀNH CÔNG CỦA CHÚNG TÔI”

(Tin, ảnh: Phòng truyền thông Ptcons)

General News, Internal news, News

THE OPENING CEREMONY OF PHU MY APARTMENT PROJECT

THE OPENING CEREMONY OF PHU MY APARTMENT PROJECT

– Congratulations to” THE CEREMONY OF PHU MY APARTMENT PROJECT “BETWEEN PHUOC THANH CONSTRUCTION CORPORATION AND ANI JOINT STOCK COMPANY.

👉In the morning of November 9th, 2020, the groundbreaking ceremony of Phu My apartment project took place – the trade name of the project is Osimi Phu My. The ceremony took place in a solemn atmosphere with the participation of representatives from both sides of the company


👉As for the representative investor, there are:

– Mr. HOANG CAO TIEN – Head of PMU

– Mr. TRUONG VAN NHO – Project Manager

* As for Supervision Consultant:

– Mr. HUỲNH QUANG NHAN – Head of Supervisory Board

Together with representatives of departments.

* Contractor’s side includes:

– Deputy General Director: Ms. VO THI LAI with representatives of departments

– Investor side ANI Company has been a successful investor in many large projects. In which, Osimi Phu My project is an apartment project located in Phu My town, where the crowded population is concentrated. Osimi Phu My project is designed and planned to be modern and smart to meet international urban standards.


👉 Phuoc Thanh is a construction contractor with over 15 years of experience in the construction field of Design & Build. As one of the most prestigious contractors in the construction industry in Vietnam with hundreds of projects covering the whole country and internationally. Phuoc Thanh is committed to bringing the project on schedule – quality – safety and efficiency.

Some project information is undertaken by the main contractor Phuoc Thanh:

Location: Highway 51, Center of Phu My Town, Ba Ria – Vung Tau Province.

Total area: 5990 m2

Scale: 3 Block Apartments: A, B, C. each Block has 18 floors.

  • Total product: 624 apartments.

(News, Photo: Ptcons PR Dept.)

PHƯỚC THÀNH – Sự thành công của đối tác chính là sự thành công của chúng Tôi

General News, Internal news, News

Human resource fluctuation after COVID-19

Human resource fluctuation after COVID-19

Whether you like it or not, COVID-19 decease still significantly affects the future of work in many professions. It is very important to grasp the picture of the upcoming recruitment market, helping businesses figure out the necessary steps and solutions. According to a preliminary assessment of the ILO (International Labor Organization), the world could lose 25 million jobs because of this epidemic. The epidemic has caused common limitations in all countries, regardless of whether it is a developed or a developing country. Labor in industries with high levels of exposure to epidemics, industries that cannot apply the “work from home” policy… all face the risk of unemployment or reduced working hours.

– According to the labor structure, Vietnam has a high rate of “unskilled labor”, accounting for 35% of the employment, along with a part of “informal labor”; these are the groups most susceptible to disease. “Developing countries face the same challenges, only with different levels of influence based on the labor structure. In addition, the difference will also depend on the ability to recover from the epidemic. This will rely on the country’s controlling and “destroying decease” capacity and its socio-economic policies in response to the effects of COVID-19 ″.

– Therefore, the HR world is facing many risks due to the increasingly complicated development of the Covid-19 epidemic. The biggest challenge facing HR departments right now is the task of coming up with possible solutions to balance workforce safety concerns with keeping the business running as usual. Therefore, they need to react quickly to respond to any situation before an HR crisis can unfold. Particularly at Phuoc Thanh Construction Corporation, information capture, and flexibility in disease prevention are always highly appreciated and must be focused on ensuring the progress of projects is not affected when committed with the owner. Therefore, not beyond the general trend of many other businesses, Ptcons still has to restructure to optimize the company’s operations, but its personnel is still maintained. In addition, to keep up with the fast schedule, the company also recruits more personnel to ensure construction quality and safety during fluctuating days.

See at: http://ptcons.com/tuyen-dung/chi-huy-truong cong-trinh.

– Since then, COVID-19 has been happening and its impacts on life, economy, and society are huge, which is a typical example of people living in the VUCA (Volatility, Uncertainty, Complexity) period (the concept to describe the ever-changing world). Therefore, each of us needs to prepare ourselves with a wealth of knowledge, the right skills for the future, and a flexible attitude. “The most important thing is the attitude to change and need to have cognitive flexibility, be comfortable with changes, curious about new things, not afraid of challenges and always be solution-oriented, hence everything will no longer have to be difficult and develop together for both the company and the employees.

(Tin,ảnh: Ptcons)

Internal news, News

Why Should We Use Aluminum Formwork In Construction Site

WHY SHOULD WE USE ALUMINUM FORMWORK IN CONSTRUCTION SITE

In the current construction industry, there are many formwork systems that can be mentioned such as natural wood form, industrial wood form, steel form, composite form, aluminum form etc., Each formwork system has its own characteristics but typically Aluminum type will create more constructional productivity, efficiency and cost savings more than the old methods. Casting concrete is the decisive factor for the construction progress of the works means that the quality, aesthetics, and construction cost of the project depending largely on this factor. With the change of technology and current formwork assembling materials, it has made great strides in the construction field.

With shaped aluminum formwork, the formwork execution process is shorter due to simple assembly, ensuring good concrete quality and surface aesthetics. Some outstanding advantages when using aluminum formwork must be mentioned as follows:

  1. High reusability:

Aluminum formwork can be used multiple times. Each aluminum set can be used 100-150 times, about 3-4 high-rise buildings, significantly reducing investment costs for construction contractors.

In order to minimize damage after use, it is necessary to meet the basic requirements such as:

  • Proper disassembly and assembly.
  • Use the required oil to spread on the surface and removal tool.
  • It is necessary to have a mechanism for supervision and sanctions handling during construction.
  1. Light, convenient structure, good stability, high bearing capacity:

This makes the assembly of the aluminum formwork very simple and convenient, quite lightweight, average 20 – 27 kg / m2, so it is easy to disassemble and move by hand without any support machinery. (Usually, the workers only need a wrench or small hammer to disassemble.) A skilled worker can install 20-30 m2 per day. With modern production technology, the design of the skeleton system linked to the aluminum plate not only ensures good bearing capacity but also minimizes weight.

  1. Tiết kiệm thời gian thi công:

The aluminum formwork system helps to assemble and dismantle quickly, shorten construction time, and save management costs.

When constructing, the workers just need to install according to the design drawing and geodetic positioning, the accessories in the aluminum structure are also made to meet the requirements for easy construction, ensuring bearing capacity.

Reduce a lot of time for workers to calculate, cut, and repair as with other types of formwork.

The average construction time of a floor has been significantly shortened, to only 3-5 days.

The supporting system is designed with 3 floors. After 36 – 48 hours, it is possible to remove the aluminum formwork in the sequence of walls, beams, and floors and retain that system at 2 adjacent floors.

  1. Wide range of applications:

Aluminum formwork can be effectively applied to most types of structural members such as floors, beams, columns, walls, and stairs. The more efficiency is when the number of typical floors, typical components in one or a building block is bigger.

  1. High value of utilization:

The utilization value of the aluminum formwork system is very high when it is possible to collect, recycle, or utilize the construction of other structures such as foundations, septic tanks, etc.

  1. Environmental sanitation:

All parts of the aluminum formwork are reusable after being dismantled, which helps to reduce site waste, ensuring a safe, clean and tidy building environment.

Lower carbon emission: Many developed countries have specified that wood formwork should not be applied in construction projects but must use renewable formwork. This shows an inevitable replacement trend in the near future.

  1. Flexibility:

The aluminum formwork has different standard sheet sizes, which are flexible to assemble according to the requirements of the respective projects. Only 10-15% of non-standard panels need replacing when reused for a new project, helping to reduce costs. Because the design standards of the aluminum formwork need carefully consider the number of standard sheets that can be used.

  1. Neat construction space:

The bracing system is also designed quite simply, by the single bracing system and the reinforcement bracing system. The ability to tweak is relatively easy. The construction space is airy, clean.

  1. Reduce the cost of defect work, plastering

Another advantage of aluminum formwork is the low possibility of structural deviation, the smooth and aesthetically pleasing concrete surface after construction. Significantly reduce the cost of completing works.

The concrete surface using aluminum formwork does not require plastering as with traditional formwork. Just sand and spray paint to finish.

  1. Easy to combine with other climbing formwork, sliding formwork:

However, it is necessary to calculate and based on construction type, the number of typical floors, and actual construction conditions, compare costs between progress shortening and formwork, labor costs to save costs, time, construction quality assurance.